06Project & Infrastructure

Electrical Value Engineering Estimating and LED Retrofits

Scope and budget optimization for projects that came in over budget. We rework the electrical package without giving up the building you set out to build.

Or call us directly(212) 765-3888
Overview

Value engineering is what we do when a project is real but the bid came back too high. It is not bidding for less. It is rebuilding the electrical package so the cost lands inside the budget without giving up function, code compliance, or quality.

We do this on projects we are bidding ourselves and on projects where another contractor is in place but the GC needs a second set of eyes. The work usually starts with a one-day review of the drawings, the spec, and the existing estimate. From there, we identify the line items that are driving cost, propose alternates, and document the trade-offs.

Our estimating, BIM, and project management teams bring electrical engineering and field experience to value engineering reviews. They evaluate proposed changes against project requirements, constructability, and cost.

For an active construction bid, align alternatives with the commercial electrical scope so changes remain visible to the owner and design team.

For an occupied building, coordinate lighting changes with property maintenance and access planning. Measured energy savings require a defined baseline and operating data.

What we do

Electrical scope reviews and lighting alternatives.

  • 01Estimating review and second-opinion bids
  • 02Scope rebalancing across electrical, fire alarm, and low voltage
  • 03LED retrofit alternatives, lighting redesign, and efficiency upgrades
  • 04Panel upgrades and capacity rework when reuse is cheaper than rip-and-replace
  • 05Cost-effective design alternatives that hold code
  • 06Long-lead and supply chain optimization
  • 07Constructability reviews for difficult site conditions
  • 08Pre-construction planning and phasing memos
  • 09Documented trade-off analysis for the owner
Who calls us

Teams comparing budget and performance options.

  • Owners and developers whose project came in over budget
  • General contractors needing a second-opinion electrical bid
  • Architects redesigning a stalled project
  • Owner reps trying to deliver a building inside a fixed budget
Completed lighting retrofit

A 21-light hotel retrofit.

Existing fixtures and installation

For a New York hotel lighting retrofit, ESE surveyed the existing downlight housings and installed 21 MR16 retrofit lights in a corridor and conference room.

Recorded result

The March 9, 2026 technician note records that all 21 lights were installed and working. The example establishes the installed scope and operating result; energy savings and a payback period were not measured in the reviewed record.

Further work discussed

The client also discussed a further group of lights and alternatives for adjusting cove-lighting brightness. Those discussions are separate from the documented 21-light installation.

Planning your enquiry

The estimate and requirements needed for a review.

Send what you have available. These details help us understand the site, define the scope, and identify the next step.

Service calls and maintenance cover New York and New Jersey. South Florida enquiries are for project work.

  • Provide the current drawings, specifications, estimate, and the particular costs or scope items you want reviewed.

  • Identify requirements that must remain, including performance, finish, controls, and owner standards.

  • For lighting work, share fixture quantities, operating hours, and available information about the existing system.

  • Tell us the budget target, decision deadline, and who must approve alternatives. Any proposed savings need a defined baseline and agreed scope.

How it goes

Compare alternatives against an agreed baseline.

Keep the current estimate and design requirements as the comparison baseline. Review each alternative for scope, performance, installation and approval implications; a proposed saving needs supporting quantities and costs.

  1. Step 01Drawings and spec review

    Send the bid set and the existing estimate. Our team reviews the drawings, the spec, and the cost basis to find the line items that are driving the budget over.

    01
  2. Step 02Alternates memo

    Within five to ten business days, we deliver a written memo with proposed alternates, expected savings, and a clear note on what changes and what does not. Each alternate has a code-compliance and quality note.

    02
  3. Step 03Owner workshop

    We sit with the owner and the GC, walk the memo, and let the owner decide which alternates are acceptable. Some VE moves are quiet. Others change the building. We are clear about which is which.

    03
  4. Step 04Updated bid

    If we are bidding the work, we issue a revised proposal reflecting the accepted alternates. If another contractor is in place, we hand the memo to the GC and the owner so they can negotiate from a real engineering position.

    04
Common questions

Alternatives, LED retrofits and savings assumptions.

  • 01

    Do you charge for value engineering review?

    If we are bidding the work, the VE review is part of the proposal and there is no separate fee. If we are doing a second-opinion review for a GC or owner, we charge a fixed engineering fee that is disclosed up front.

  • 02

    Will the building still be code compliant?

    Yes. Every alternate we propose holds against current NYC and applicable state codes. We will not propose a savings that compromises code compliance.

  • 03

    Can you redesign for LED retrofit specifically?

    Yes. LED retrofit and lighting redesign is one of the most common VE moves we make on existing buildings. We will model the savings, the rebate eligibility, and the payback before recommending the change.

Ready to send us a bid set?

(212) 765-3888