Planning guide / Distribution design & coordination

Electrical drawing deliverables: agree what the files must do

By Empire State Electrical4 min read
On this page

Requesting “electrical drawings” can leave project teams pricing different deliverables. One proposal may allow for review PDFs. Another may assume editable drawings, a coordination model or an electrical system model. Before comparing those proposals, describe what the recipient needs to do with the finished files.

For owners and general contractors, a short deliverables brief can make that discussion concrete. It should connect each requested output to its intended use, required information and reviewer.

1. Start with the next task

Ask who will receive the package and what decision or activity it must support. Reviewing conduit routing, coordinating service-room space and maintaining an electrical network model are different requests.

List the outputs separately. For example, a project might request service-room arrangement drawings for design-team review and a separate equipment schedule for coordination. Identify the buildings, areas and systems each output covers. Keep future phases visible without assuming they are included in the current price.

Where the recipient needs to edit or reuse information, ask that recipient to state the required file format and software version. Agree what must be delivered alongside the viewable issue.

2. Describe the information, not just the file extension

A file-format request still needs a content definition. Ask what equipment information, references and relationships the recipient expects to find, and who supplies them.

Schneider Electric's white paper on single-line diagrams distinguishes traditional drawings from intelligent electrical network models carrying additional technical data and functions. That is a useful reason to clarify the request: a drawing package and a model intended for electrical analysis need different scope discussions.

If the brief says “BIM,” ask the project coordinator to define the requested model content, coordination tasks and issue format. If electrical calculations or simulations are needed, identify them separately and name the responsible engineering party. Avoid leaving those expectations inside a general request for digital files.

3. Give each deliverable a complete scope line

Use the same fields for each requested output:

  • Purpose and recipient: the next task and the person using the files.
  • Coverage: buildings, areas, systems and exclusions.
  • Inputs: design documents, equipment information and who provides missing data.
  • Output: required sheets, schedules, editable files or model content.
  • Review: named reviewer, issue dates and included response stages.
  • Completion evidence: the agreed checks and record of review outcome.

For an illustrative service-room arrangement package, the brief could identify the room, required plan and sections, source design issue, equipment information still awaited, output formats and design-team reviewer. It should also say whether site verification, calculations, model coordination or installation records are included, excluded or awaiting agreement.

Use that scope line to compare proposals. When an allowance differs, resolve the deliverable question before treating the prices as equivalent.

4. Keep drawing production and design responsibility clear

ESE's distribution drawing and coordination scope separates contractor shop drawings from engineer-of-record design. Its public guidance also asks teams to identify BIM, clash-detection or particular digital-format requirements in the enquiry so deliverables can be assessed and agreed.

Name who provides the design basis, who prepares contractor details and who reviews them. Record which separate engineering or specialist services the project needs. A drawing-production appointment should explain those boundaries before work begins.

5. Agree how the package will be received

Before the final issue, ask the receiving team to confirm that the agreed files can be opened, the required outputs are present and unresolved information remains identified. Keep the document list and review outcome with the delivery.

If installation is part of another package, agree who will supply field changes and prepare final records. A submitted drawing, a reviewed drawing and a record of installed conditions represent different stages; track each against its own agreed purpose.

For a proposed distribution drawing engagement, share the existing design, intended use of the files and deliverables brief with ESE. Call (212) 765-3888 to discuss the construction coordination scope and required project specialists.

Sources and further reading

All insights & projects